MenuButton

About Us

The History of Syn-core Directional

Syn-core Directional has been operating out of southern Alberta since 2002. Here is bit of timeline of the growth of our company:

October 2002
Founded
Established in southern Alberta in October 2002 by Clint and Amber Capton
October 2002
October 2002
First crew
Started with 2 pit machines, an American 36" Auger machine, a UTI Directional Drill, a backhoe and 5 employees
October 2002
Vermeer Directional Drill in Mountaints
2005
Vermeer drill added to fleet
2005 purchased a 40x40 Vermeer Drill for oilfield work
2005
SynCore Hydrovac truck southern Alberta
2006
HydroTruck added
2006 purchased first hydrovac truck
2006
2009
Added another Vermeer
2009 purchased a 80x100 Vermeer Drill to complete a waterline project in the County of Newell
2009
Man working near horizontal augering equipment
2010
Auger Machine added to the Fleet
2010 purchased A Barbco 60/48 Auger machine for the larger diameter Irrigation pipelines
2010
Field Drainage trenches
2011
Company Acquisition
Purchased Prairie Ditching Ltd and started plowing waterlines, utilities and installing field drainage systems
2011
2011
Second Shop
We purchased our second shop and land in Coalhurst, Alberta
2011
Setting Up Field Drainage Systems Using Bron Equipment
2013
Bron Plow
Purchased our first Bron 450 Plow for installing water lines
2013
2013
Biggest HDPE Project To Date
In 2013 we completed the Hamlet of Schuler Regional Water Supply contract: 25km of 4" HDPE installed!
2013
Akkerman horizontal augering equipment on a project
2014
Akkerman Boring Machine added to Fleet
Purchased Akkerman Guided Boring Machine to install large diameter steel pipe
2014
Field Drainage Equipment
2015
Another Bron added to the fleet
Purchased Bron 550 Drainage Plow
2015
2016
20km pipeline completed
Completed the New Dayton to Wrentham pipeline which consisted of 20km of 6" and 4" HDPE
2016
2017
Additional land purchased
We expanded our space in Coalhurst and acquired the land and building adjacent to our shop
2017
2019
Manyberries Project
Completed the Manyberries to Orion project which consisted of 15km 4" HDPE
2019
2020
New shop built
Built a new 7 bay shop on our property in Coalhurst
2020
AirHammering Mincon Bit Syncore Directional
2020
Air Hammer Project
Drilled through solid rock under 3 creeks and a river in the Beaver Mines area with our Mincon Air Hammer
2020
2021
Boring under OldMan River
Syn-core drilled three pipelines under the Oldman River consisting of 8" and 10" HDPE
2021
Pipe Ramming Project Syn-Core Directional
2021
Added Goliath Hammer to Fleet
Purchased 18" Goliath Hammer
2021
2021
Cardston Project
Syn-core rammed 36" casing under Lee Creek in Cardston
2021
2021
Where we are at today...
We have available 3 tri-axle hydrovacs, 2 auger machines, 9 Directional Drills, a mud reclaimer, 18" air hammer, Mincon hammer, 3 Excavators, and 2 backhoes. We also have 18 employees, a full time mechanic, and welder on staff.
2021

Follow us on Facebook and Instagram!